(Summary description)AtasubstationsiteBonleparticipatedintheconstruction,PresidentMr.Laiinspectedtherunningconditionsalongwiththeengineers.Site:AbujaNigeriaProject:NIPP/EPC-D-LOTAB1-1
- Categories:Case
- Author:
- Origin:
- Time of issue:2018-01-18 22:32
- Views:
Information
At a substation site Bonle participated in the construction, President Mr.Lai inspected the running conditions along with the engineers.
Site: Abuja Nigeria
Project: NIPP/EPC-D-LOT AB1-1