HW 4-150

SpecialnutandmomentnutAppearancediagramofInstallationPlerclngeffectofwirecore
TYPE: HW 4-150
Applicabe voltage: 1 
Main: 35-150mm²
Service: 35-150mm²
Nominal current(A): 316
Bolt number (pcs): 1
image/6dB47NNhRCumXxkF4Sb3PA
attribute:

  • Special nut and moment nut

  • Appearance diagram of Installation

  • Plerclng effect of wire core
Simple Installation

  • 1. Adjust the connector nut to suitable location

  • 2. Put the branch wire into the cap sheath fully.

  • 3. Insert the main wire,if there are two lays of insulated lay the main cable,should strip a certain length of the first insulated lay from inserted end.

  • 4. Turn the nut by hand,and fix the connector in suitable location.

  • 5. Screw the nut with the sleeve spanner.

  • 6. Screw the nut continually until the top part is cracked and dropped down.

 

The reason of choosing insulation piercing connector(IPC)

-Simple installation
Can be branch of cablewithout stripingthe insulated coat andthe joint is completely insulated.Make branch in the random location of cable without cuttingoff the maincable.Simpleand reliable installation.just need sleeve spanner.can be installed with on live line.
-Safe use
The joint has go dresistance to distortion,quake,fire,wet,electrochemical corrosion and aging.need no main-tenace.
-Economical cost
Small inst lation space.save the cost of bridge and landconstruction,ln strctural application, there need noterminalbox, junction boxand etrunwireof cable.save cable cost,The c st of cables andcalmps is lower than othe power supply system.

 

这是描述信息

Tel:+86-591-87533017, 88000103,
88000107, 88000113, 88000115

这是描述信息

3/F NO. 91 Taiyu Rd, Fuwan Pian,
Jinshan Industrial zone, Fuzhou,PRC 350008

这是描述信息

sales3@bonle.com; sales5@bonle.com
sales6@bonle.com; sales8@bonle.com
sales88@bonle.com

Company

Products

Service

Follow us

Copyright© 百纳(福州)进出口有限公司 All Rights Reserved 闽ICP备17032973号-1 Powered by saa